Skip to content
All Build Stages

Major Build Stages

LOCK-UP

Secured and enclosed.

Lock-up stage seals the building envelope. Roofing, cladding, windows and external doors all come together to make the structure weathertight. Flashing and waterproofing details done wrong here are the source of most post-handover water damage claims.

Stage 04: Lock-up 12 Events

Stage 4 of 6. 12 minor events covered.

Stage 04. Lock-up

Minor Events

Click any event to see what's covered and how it's delivered on the platform.

Major Stage. Lock-up Complete

Roof Sheeting

3 delivery methods

External Wall Cladding

3 delivery methods

Gutters & Downpipes

3 delivery methods

External Doors & Frames

2 delivery methods

Window Installation

3 delivery methods

Flashing & Weatherproofing

4 delivery methods

Roof Space Insulation

2 delivery methods

Garage Doors

3 delivery methods

Eaves & Soffits

2 delivery methods

External Waterproofing

2 delivery methods

Lock-Up Inspection

4 delivery methods

Temporary Security

2 delivery methods

Event 01 of 12

ROOF SHEETING

Metal roof sheeting (Colorbond or Zincalume) or concrete/terracotta tiles are fixed to the battens over sarking. Fixing centres, lap details and ridge/hip flashing are all specified and inspected.

Delivered through
Video Content Interactive Module On-Site QR Guide